Case Studies

09-May-2017

Logistics Solutions

A staged approach to match strong projected growth   Company Facts Industry: Logistics and Freight Location: Airport, Auckland Key objectives Maximise warehouse capacity Ensure optimal efficiency Prepare for future growth   The solution Design, installation, project management A unique staged approach to installation Products supplied include pallet racking, 8-9m high frames throughout the building, b... view details

Fastening Supplier

09-May-2017

Fastening Supplier

  VNA storage for leading fastening supplierCompany Facts   Company: Leading fastening supplier Industry: Specialised fastenings and fixings Location: Auckland Key objectives   Maximise warehouse capacity  Allow traceability of product Ensure optimal efficiency and get product to the customer faster Prepare for the future with a high tech warehousing operation The solution    Design, installation and project manageme... view details

Longview

19-Mar-2017

Longview

Providing Longview with a state of the art semi-automated pallet racking system Key Objectives Maximise coolstore capacity and floor utilisation Work within the existing footprint The Solution Design, installation and project management 28 lanes of racking, 13 pallets deep and 3 tiers high Total capacity of 1500 pallets with scope to increase by 390 Partnership with ScottPHS to provide a semi-automated shuttle cart The Benefits Significantly increased density and capacity of the same coolstore footprint Increased sa... view details

WineWorks

29-Sep-2016

WineWorks

Key Objectives New warehouse fit out Achieve maximum efficiency Maximise the flow of a large storage area and improve efficiency The Solution Design, installation and project management Fitted with 16,000 pallet position of shuttle racking Custom design solution for a 14m high storage system Custom design solution for flow and efficiency The Benefits Maximised flow and efficiency of the large area Completed on time and on budget, allowing WineWorks to continue helping their customers be successful Reduced downtime in forklift mo... view details

Hylton Parker (Konnect Shop)

29-May-2016

Hylton Parker (Konnect Shop)

Objective: Upgrade Achieve maximum efficiency Ensuring safety Solution: Consult at all stages with Hylton Parker (Konnect Shop) The smooth transition, on time and on budget. Efficiency of space tailored to the needs of Hylton Parker (Konnect Shop)  “Throughout the process Storepro made us feel as though our project was “Important to them”. They took the time to show us several recently completed projects – discussed the merits of various racking installation options and also put us in contact with other equipment suppliers to en... view details

Harley Davidson

29-May-2016

Harley Davidson

Objective: Relocation fit out Minimum disruption More storage area Flow Solution: Stress free, on time and on budget fit out  Custom design solution for maximum efficiency “Auckland Harley Davison employed the services of Storepro for our recent Warehouse relocation. They made what could have been a really difficult time relatively stress free, as they were very organised and communicated very well. The job had to be relocated in stages and was completed when they said it would be and to the agreed price. I would have no hesitatio... view details

Bikes International

29-May-2016

Bikes International

Objective: New branch fit out Efficiency Competitive Price More storage area Flow Solution: Job completed on time and on budget Maximise flow and storage for the new location Customer was contacted at all stages for approval Why did you choose Storepro for your shelving? With building a brand new purpose built Distribution Centre in Christchurch, we went to the market to ensure the company we engaged had experience and knowledge in the Christchurch region. Storepro pricing was competitive, but more... view details

Carroll Logistics

29-May-2016

Carroll Logistics

Objective: Upgrade Achieve maximum efficiency Cater for various size and weight items Solution: The smooth transition, delivering on time and on budget. Adapt to the space and maximise efficiency. Minimise down time Why did you choose Storepro for your shelving? We had definite ideas as to what we wanted to achieve and this was going to have its challenges. Storepro had the capability, patience and enthusiasm to see the project through with us, the end result is something we are all proud of.... view details

Bremick

29-May-2016

Bremick

Objective: New branch fit out Fit warehouse, office and show room into the site. More storage area Flow Solution: Installation on time and on budget On going maintenance and support Designed to comply with the licensing standards Maximise the space design solution to reach efficiency and more storage space Why did you choose Storepro? The relocated Bremick Auckland Warehouse, Office & Show room was designed at the outset to provide our Customers with superior and rapid service, reliability an... view details

HI-Tech Packaging

29-May-2016

HI-Tech Packaging

Objective: New location fit out Achieve maximum efficiency Ensuring safety Maximising space Cater for various size and weight items Solution: Maximum capacity of hi-rise pallet packing 7 months to build and 3 weeks to install Smooth process of fit out on budget and on time Storepro recently completed a new 6,000 square metre facility at Auckland Airport for an Australian owned and based clothing supplier and distributor. With a mix of 10 metre high picking shelves in a narrow aisle configuration and 10 metre high pallet racking, the... view details

Forman Building Systems

29-May-2016

Forman Building Systems

Objective: Redesign of the existing warehouse Safety Compliance Achieve maximum space efficiency Ergonomic flow Cater for various size and weight items Solution: Compliant to local laws and regulations Supply of new pallet racking over 6 metres and cantilever racking over 7 metres On time and on budget delivery Space and operational efficiency Storepro can now add Dunedin, Wellington and Auckland to the list of successfully completed warehousing projects with Forman... view details

Quantium

29-May-2016

Quantium

Objective: New branch fit out Achieve maximum efficiency More storage area Flow Solution: Fitted with 130sqm of Pigeon Hole Raised Storage Custom design solution to reach efficiency On time and on budget solution and fit out. Designed for extra capacity to accomodate for future growth Congratulations to Quantium Solutions, an established regional and global logistics provider, for their successful move into their new 1760sqm warehouse facility due to their current growth. The grand opening took place earlier this month, with s... view details

EIF International

29-May-2016

EIF International

Objective: New branch fit out Efficient use of space Flow Solution: Installation on time and on budget On going maintenance and support 3336 pallet postions, maximising pallet storage with the most efficient use of space EIF International, the New Zealand Independently Owned Freight Company, has moved into the neighbourhood with a brand new facility in Manukau that delivers on space and location, fulfilling their requirements and catering to the needs of their customers. Our project team worked closely with EIF to accommodate the move into th... view details

Bunnings

29-May-2016

Bunnings

Objective: New branch fit out Achieve maximum efficiency More storage area Flow Solution: Fitted with 130sqm of Pigeon Hole Raised Storage Custom design solution to reach efficiency Custom design solution for flow and doubling the storage area  As a leading retailer of home improvement and outdoor living products in New Zealand and Australia, Bunnings is a major supplier to project builders, commercial tradespeople and the housing industry. Their new West Auckland Branch in New Lynn required 130sqm of Pigeon Hole Raised Storage ... view details

Penske

29-May-2016

Penske

Objective: New branch fit out Achieve maximum efficiency More storage area Cater to the different sized products Flow Solution: Fitted with 1800sqm Selective Pallet Racking, Mesh Shelving & High Density Mesh Shelving Custom design solution to reach efficiency for the storage area Maximise flow and minimise down time Continuing to strive to new heights, Storepro has just completed the warehouse installation for Penske Commercial Vehicles, one of our elite customers, at their new site located in Wiri, South Auckland. The wa... view details

Shuttle Racking

29-May-2016

Shuttle Racking

Objective: Upgrade Maximise efficiency Maximise return on investment Space efficient Solution: Semi-automated put away and retrieval process Reduce damage to racking system - no hoists accessing the racking Speed of picking and put away, reduce labour time No special forklift requirements Offers both FIFO and LIFO - great for stock rotation Greater rigidity and strength in design - no need for seismic bracing or larger post sections. Semi-Automated Warehousing hits the Apple Industry Storer had undertaken a state of the ... view details

Eurovintage

25-May-2016

Eurovintage

Objective: Increase productivity Minimise warehouse downtime More storage area Flow Solution: Introduced new systems and technology Increased functionality Maximised storage area Custom designed the flow of the shelving to minimise down time and make it more accessible Eurovintage is a privately owned wine distribution company that has been operating for over 20 years. Nationwide service stretches from Kaitaia in the far north to Bluff in the deep south, offering a premium portfolio which includes some of the most elite brands and est... view details

Chemfreight - Racking for a dangerous environment

21-Dec-2014

Chemfreight - Racking for a dangerous environment

Increasing legislation around hazardous storage now means that companies need to be very careful about safely storing and distributing their own dangerous goods – and many companies have at least small quantities of those. The Hazardous Substances and New Organisms Act 1996 (HSNO) covers not only identifying and storing and the distribution of such items, but outlines explicit liabilities for ‘acts and omissions of others’. This provides for companies, directors and employees to be personally liable if they have done or omitted to do something specific within the a... view details

USL: Medical challenged - Storepro delivered

14-Dec-2014

USL: Medical challenged - Storepro delivered

USL Medical supplies both large and small healthcare products to New Zealand care providers and patients. The team are determined to be market leaders, aiming to supply the right products at the right time and, as such, their warehousing systems must be as efficient as possible in every way. Their strategies are paying off rapidly.  The company had only been in its 3000 sq m distribution centre in Avondale, Auckland, for three years when planning had to begin to relocate to a warehouse almost twice the size. For supply chain manager Anthony Lane, planning had begun 12 months b... view details